Kyrgyz Republic · Issyk-Kul Region

Mountain river power, working for the region

Boz-Uchuk small hydropower plant — 5.4 MW of renewable capacity, commissioned in 2025. Clean energy for the Kyrgyz Republic.

5.4 MW
Installed capacity
25 million
kWh generated per year
2025
Commissioned
Pelton
Turbine type
About the plant

A small hydropower plant in challenging mountain terrain — a major contribution to energy security

Capacity5.4 MW
Output25 million kWh/year
Head599 m
Flow rate1.2 m³/s
TurbinePelton (CINK Hydro Energy)
StatusOperational

Project history

The story of Boz-Uchuk HPP began in 2022, when a group of like-minded people, united by a shared vision for developing renewable energy in the Kyrgyz Republic, founded Ananyevo HPP LLC.

The company's first and most significant project was the Boz-Uchuk small hydropower plant, created to provide the region with clean and sustainable electricity. After the necessary studies, design work and approvals, construction of the plant began in 2024.

The project was carried out under challenging mountain conditions and required close coordination between engineers, builders, equipment suppliers and local specialists. Thanks to the team's professionalism and the support of partners, construction was fully completed by May 2025, and the plant was successfully commissioned.

Today, the 5.4 MW Boz-Uchuk HPP generates around 25 million kWh of clean electricity every year, contributing to the energy security of the Kyrgyz Republic, reducing greenhouse gas emissions, and supporting the region's sustainable development.

The project marked not only the first step for Ananyevo HPP LLC, but also an example of how the power of mountain rivers can serve people, creating a reliable and environmentally responsible future for generations to come.

Ecology & ESG

Environmental performance of the Boz-Uchuk project

Reducing CO₂ emissions

Generating electricity from mountain rivers instead of fossil fuels cuts greenhouse gas emissions and supports the climate goals of the Kyrgyz Republic.

Renewable energy

5.4 MW of installed capacity and around 25 million kWh per year — a contribution to the region's energy independence through a clean, renewable source of power.

Water resource use

The plant's diversion scheme requires no reservoir: water is returned to the riverbed after passing through the turbine, minimising the impact on the ecosystem.

Contact us

Have a question or suggestion?

Send us a message — we'll reply to the email you provide.

Plant location

Kyrgyz Republic, Issyk-Kul Region

Plant facilities

  • Water intake
    Water drawn from the mountain river
  • Penstock
    Head 599 m
  • Powerhouse
    Pelton turbine, 5.4 MW
  • Power line
    Power delivery to the grid

The map shows the plant's location. Markers for individual facilities (water intake, penstock, power line) will be added once their coordinates are provided.

Environmental & social grievances

If you have any comments, suggestions, complaints or grievances related to the environmental, social or other aspects of Boz-Uchuk HPP's operations, you can submit them through this form.

All grievances are registered, reviewed according to the established procedure, and receive an official response.

  • up to 3 business daysregistration confirmation
  • up to 15 business daysgrievance review
  • up to 30 business daysif an investigation is required
📄 Download the GRM procedure (PDF)

Applicant details

Grievance details